1943/A
2004
Novara (Piemonte)
Industriale
some mining in South Africa and in Sub-Saharan Africa. some case studies on disaster recovery / emergency camps in Nepal and in Sri Lanka.
4th Bid Round: No. 2 hydro power plants, around 2.5 MVA each one.3rd Bid Round: No. 2 wind farms, around 40 MVA and 135 MVA; No. 4 PV power plant around 10 MWp, No. 1 with 12 MWp and No.1 with 50 MWp.2nd Bid Round: No. 4 fixed tilt PV power plants around 10 MWp, and No. 1 with 27 MWp, having single axial solar tracker.1st Bid Round: No. 1 81 MWp PV power plant having single axial solar tracker.
supervision on the engineering process (design, bill of materials and technical specifications on main components);support to project management on request of proposals and on the estimation of the installation budget;support to asset management on the implementation of procedures in order to guarantee the compliance with technical, administrative and authorization requirements requested by Italian Authorities like Agenzia delle Dogane, GSE Spa and Enel Distribuzione Spa; modelling and estimation of the expected yearly production (included solar source assessment); energy audit and energy report in accordance with P50 and P90 criteria as requested by Lender Technical Advisor;approval by the Lender Technical Advisor during a Technical Due Diligence during the company’s portfolio assessment.
preliminary technical assessment and economic feasibility of the project;support to project management on budgetary cost estimation and on sensitivity analysis of the business model.
sites scouting;preliminary technical assessment and economic feasibility of the project;modelling and estimation of expected yearly production;preliminary sizing and engineering (bill of materials, technical specifications on main components);budgeting, management of requests for proposals, support to the project management for the definition the cost of installation.
modelling and estimation of the expected yearly production;preliminary technical assessment and economic feasibility of the project;preliminary sizing and engineering (bill of materials, technical specifications on main components);budgeting, management of requests for proposals, support to the project management for the definition the cost of installation.final design of 57 MWp fixed tilt PV power plant in the province of Udine structured in 7 sub-systems (clusters), including modelling and estimation of the expected yearly production(included solar source assessment);budgeting, management of requests for proposals, support to the project management for the definition the cost of installation.
modelling and estimation of the expected yearly production (included solar source assessment);preliminary technical assessment and economic feasibility of the project;preliminary sizing and engineering (bill of materials, technical specifications on main components);budgeting, management of requests for proposals, support to the project management for the definition the cost of installation.
bill of materials, and technical specifications regarding the main components, management of proposals, costs estimation and budgeting;technical Support for the grid connection contract closing with ESKOM, South Africa’s TSO and DSO.
modelling and estimation of the expected yearly production (included solar source assessment);energy audit and energy report in accordance with P50 and P90 criteria as requested by Lender Technical Advisor;technical support during permitting and erection phase;preliminary technical assessment and economic feasibility of the project; preliminary sizing and engineering (bill of materials, technical specifications on main components);budgeting, management of requests for proposals and support to project management for the definition the cost of installation.
sites scouting, solar source assessment and energy audit; preliminary technical assessment and economic feasibility of the project; preliminary sizing and engineering (bill of materials, technical specifications on main components); support to project management for the definition the cost of installation.
sites scouting and solar source assessment and energy audit and energy report in accordance with P50 and P90 criteria as requested by International Lender Technical Advisor; preliminary and final technical assessment and economic feasibility of the project; preliminary and final sizing and engineering (bill of materials, technical specifications on main components);support to project management for the definition the cost of installation
1 MWp having vertical axis solar tracking;1.45 MWp, No. 2 MWp and 4 MWp having tilted (20 °) axis solar tracking;1.6 MWp having fixed tilt;1 MWp having horizontal axis solar tracking.
in Apulia having respectively 18 and 20 MW as rated power.in in Tuscany having respectively 36, 39 and 42 MW as rated power. in Sicily power respectively by 36, 10, 60, 20, 28, 52, 80, 37.5 and 42 MW.
several PV power plants in Sicily (around 25 MWp).No. 2 biomass power plants, 24 MW each on, in Melpignano (LE) and Mesagne (BR), both in Apulia.